Final assembly & engine install
|
2/20/06 |
Mounted tires on rims |
2.0 hrs |
|
2/21/06 |
Mounted axles to gear legs |
2.5 hrs |
|
|
2/23/06 |
Set toe in and drilled fuselage gear sockets. Began installation of floor board and rudder pedal assembly. |
3.0 hrs |
|
|
|
|||
|
2/26/06 |
Installed rudder pedals. Installed master cylinder and wear plate. |
2.0 hrs |
|
|
|
|||
|
3/5/06 |
Riveted and installed remaining 2 rudder pedals. Two right and two left parts had been left out of the kit and I had to order them. I got them Friday; four dollars and some change each from Rans. Installed nose gear disconnect and shimmy damper. Found tube spacer to be too long - unsure of proper length need to think about this, nothing in manual. Temporarily installed firewall and installed and riveted contour formers. | 6.25 hrs | |
|
|
|||
|
3/6/06 |
Began test fitting tail boom section longerons and tubes. Pulled parts needed for assembly of boom. |
.75 hrs |
|
|
3/7/06 |
Riveted outer gussets to center locator hole on longerons. Siliconed stub at steel cage and slid longerons on. Began initial assembly of support tubes. |
2.0 hrs |
|
|
3/8/06 |
More work on tail boom. Installed sta 6 gusset and tail gusset. |
2.0 hrs |
|
|
|
|||
|
3/9/06 |
More riveting on tail boom. Double and triple checking angles and dimensions. Laid out side stringers for the next project. |
2.0 hrs |
|
|
|
|||
|
3/12/06 |
More riveting on tail boom.. Installed x brace cables at stations 4 and 5. |
3.5 hrs |
|
|
3/14/06 |
Assembled control sticks and installed. Assembled aileron control tee and installed |
2.5 hrs |
|
|
|
|||