8-14-06

Layout panel and decide on avionics and instrumentation.

3.0 hrs

8-15-06 begin panel cutout 3.0 hrs
8-18-06 More panel cutout work. 3.0 hrs
8-24-06 Cut out door for map compartment which will house the Lowrance Airmap gps. Installed tray for A200. I received the Airmap, Icom A200 com. Airgizmos dock, elt, and other misc stuff today from Pacific Coast Avionics and Chief Aircraft 3.5 hrs
8-25-06 Fabricated map compartment. 1.5 hrs
Toshiba - Toshibadirect.com
9-17-06 Finished cutting holes in panel. Painted panel and lower panel. Wired intercom and radio. Installed panels. Riveted in map box. Ran antenna cable and installed bnc and ted ends. Installed antenna. Installed engine instruments in panel. Installed elt annunciator. Installed radio tray. Installed parking brake cable. Installed upper panel brace. 11.5 hrs